Project Description:

The project was to construct a new single storey teaching block providing eight specialist classrooms and supporting areas for children with special needs.

The location of the new building was in a confined corner of the school grounds, and close to the existing building and temporary buildings which required daily communication with the school to ensure that our works didn’t impact on the operation of the school.

The building was constructed using a steel frame with metal roof and external brick and block skin, the internal walls were constructed to cope with the daily rigors of a specialist school without feeling clinical. The building also contained specialist hoist and track systems, along with a specialist sensory room.

Your 360 Design
Revolution Starts
Here

Enquire
STM360 workers wrapped in arrows

Testimonials

  I just wanted to say how respectful, approachable and supportive STM360 have been over the last few weeks balancing the works they are doing with the functioning of a busy secondary school. Mat in particular, has been brilliant - nothing is ever too much trouble and I feel informed and worked with rather than done to. I really do appreciate the work they have done but more importantly I appreciate how the work has been done.

  I would like to thank STM360 for the many years of dedication, quality work and professionalism that they have continually demonstrated during the time that we have worked together. I have always been impressed with how they deal with the challenges and time constraints that we, as a business, have put upon them. They always face these issues and resolve them within our agreed timescales.

  Without the skills, professionalism and eagerness of the STM360 staff and sub-contractors, we would never have managed to get the project completed in time for the start of term this September. I would be more than happy to recommend STM360 to anyone else who requires a company whose service is ‘second to none'

Long arrow right

Contact Us

Contact arrows